Renting boom lifts without a surprise on the invoice: what to settle before a machine is put on a trailer

Renting boom lifts goes wrong in the same four places every time: the reach was measured to the wrong point, the machine could not stand where the work is, nobody checked the power source against an indoor floor, and transport was quoted one way. Settle those and the day rate is the easy part of the conversation.

Measure to the platform, then add a person

Yards catalogue a boom by platform height and the useful figure is roughly six feet above that, because a person standing in the basket reaches over its floor. Horizontal outreach is the other half and it shrinks as the boom rises. Give the yard the height, the distance from where the wheels can stand, and what is in between.

A straight stick will not bend over a parapet

A telescopic boom, the straight stick, gives the longest reach out and the simplest set up. An articulating boom bends, so it climbs up and over a roof edge, a canopy or parked plant. If the work sits directly above something you cannot move, the articulating machine is the only one that will get to it.

Electric on slabs, diesel on dirt

Electric booms are narrow, quiet and leave no fumes, and they want a firm level surface. Rough terrain diesel machines bring four wheel drive, oscillating axles and the weight that goes with them, and no facilities manager lets one indoors. Booking the wrong one is the commonest reason a lift arrives and goes straight back.

Transport, and who supplies the harness

Transport is quoted out and back, priced on the truck the machine needs and the access at your end. Before it arrives, settle fall protection: federal rules call for a harness and lanyard attached to the manufacturer's anchor in a boom type platform, and yards hire harnesses by the day if you have none.

Questions people ask about renting boom lifts

How far ahead should I book a boom lift?

A week for a common electric machine, longer for anything above 60 feet or any rough terrain unit, and longer again in spring. Yards hold small fleets at the tall end and those machines move between long jobs, so they book out first.

Can I hire a boom lift without an operator?

Yes. Bare hire is normal and the yard gives a familiarisation on the machine at handover. Training and authorising the person on the controls remains with their employer, which is the part homeowners most often miss.

How short can a boom lift booking be?

One day at most yards, though tall and rough terrain machines often carry a longer minimum because of what transport costs. Ask for the week rate in the same call: three days at a day rate usually costs more than a week does.

Does the rate include fuel or charging?

Diesel machines go out full and come back full or you pay the yard's refuelling rate. Electric machines arrive charged and need somewhere to plug in overnight, which is worth checking on a site that has no power connected yet.

Sources

Related answers

Get rental quotesSize the machine first